Saturday, 07 June 2014 21:28

Electric Power

Written by
Rate this item
(0 votes)

The private sector can participate in electricity generation from any source and without any capacity limit. Transmission and supply of electrical energy through the Integrated National Grid System is, however, exclusively reserved for the Government. But, private investors, both foreign and domestic, are allowed to operate an off-grid transmission and distribution of electricity.

Read 1543 times Last modified on Wednesday, 23 November 2016 08:56
More in this category: « Education Tourism »

Leave a comment

Make sure you enter all the required information, indicated by an asterisk (*). HTML code is not allowed.